Grey Structure Cost Calculator Lahore

Calculate grey structure cost in Lahore, labour-rate only (PKR 600/sft) or with material (PKR 2,500/sft). RCC, brickwork, plaster, roof, all included.

Labour rate: you supply material. With material: we supply everything.
Grey Structure Cost
Rs. 47.81 Lakh
Range: Rs. 45.42 Lakh โ€“ Rs. 52.59 Lakh
Covered Area~1,912 sq ft
Rate AppliedPKR 2,500/sft
What is IncludedRCC + brickwork + plaster + roof
To Add Finishing+PKR 1,750/sft = PKR 4,250/sft turnkey

What Is Grey Structure in Pakistani Construction?

Grey structure (often called "shell construction" or "structural skeleton") is the milestone in Pakistani house construction where the load-bearing skeleton is complete but no finishing work has begun. It includes RCC foundation, columns, beams and slabs, brick walls, internal and external plaster, and roof waterproofing. The house at grey-structure stage is weather-protected and structurally complete but has bare cement walls, no flooring tiles, no doors and windows, no electrical fixtures, no kitchen and no paint.

Two Grey Structure Pricing Options

With Material (PKR 2,500/sft), Pillarstone Developers arranges all material: cement (DG Khan, Maple Leaf or Bestway), steel (Mughal, Amreli or Ittefaq Grade-60), bricks (first-class machine), sand, crush. You pay one inclusive rate per sq ft of covered area. This is the most popular option because it removes procurement headaches and locks in your cost.

Labour Rate Only (PKR 600/sft), You supply all material from your own contacts or directly from suppliers. We provide labour, skilled masons, site engineer and supervision. Owners with material supplier contacts or those who want maximum control over brand and quantity choices use this option. It saves money but requires daily site coordination.

What Is Included in Grey Structure

RCC foundation (footing, plinth beam, columns, beams), all slabs (ground, first, second floor as applicable), all brick walls including boundary wall on the plot perimeter, internal and external plaster (two coats sand-cement), roof waterproofing (chemical-based), parapet wall, mumty (roof access room), and basic utility conduits for future electrical and plumbing.

What Is Not Included

No flooring tiles, no kitchen, no bathroom fittings, no electrical fixtures or fans, no doors and windows, no paint, no sanitary ware, no boundary wall gate, no driveway or lawn work. These come under "finishing" which adds PKR 1,750/sft for standard or PKR 2,300/sft for premium grade, total PKR 4,250-4,800/sft for complete turnkey.

2026 Grey Structure Cost Examples

5 Marla double-storey grey structure with material: approximately Rs. 47-53 Lakh. Same labour-rate-only: Rs. 11-13 Lakh (you supply ~Rs. 35 Lakh of material). 10 Marla double-storey grey structure with material: Rs. 95-110 Lakh. 1 Kanal double-storey: Rs. 1.78-2.07 Crore. The calculator gives exact ranges for your specific plot.

Why Choose Grey Structure First, Finishing Later?

Many owners build grey structure first, then take 6-12 months to plan finishing, choosing tiles, sanitary ware, kitchen design and paint colours at leisure. This staged approach also lets you spread payment over a longer period. The grey structure can sit complete and weather-protected for 1-2 years without damage if waterproofing was done correctly.

From Grey Structure to Turnkey

The jump from grey structure (PKR 2,500/sft) to complete with finishing (PKR 4,250/sft) is PKR 1,750/sft of covered area. For a typical 10 Marla double-storey build (3,825 sq ft covered), that is approximately Rs. 67 Lakh in finishing. Premium finishing adds another PKR 550/sft. Use our main Construction Cost Calculator for full turnkey estimates.

FAQs

Grey Structure Cost, FAQs

What is the difference between PKR 600 and PKR 2,500 per sft grey structure?

PKR 600 is labour-rate only, you supply all material (cement, steel, bricks, sand, crush). PKR 2,500 is the with-material rate, Pillarstone Developers supplies everything and gives you one inclusive cost. Most clients choose with-material to avoid procurement coordination.

What exactly is included in grey structure?

RCC foundation, columns, beams, all slabs (ground, first floor, second floor as applicable), brick walls, internal and external plaster, roof waterproofing, parapet wall, mumty, boundary wall, and basic electrical/plumbing conduit. No tiles, paint, doors, windows, fittings or finishing.

How long does grey structure take to complete?

For 5 Marla double-storey: 4-6 months. For 10 Marla double-storey: 5-7 months. For 1 Kanal: 7-9 months. Grey structure is approximately 65% of total turnkey timeline.

Can I add finishing later after grey structure?

Yes. Many owners complete grey structure, then take 6-12 months to plan finishing. The structure stays weather-protected for years if waterproofing was done correctly. You can return for finishing at PKR 1,750/sft (standard) or PKR 2,300/sft (premium) added to your original cost.

Do you supply all material brands at the PKR 2,500/sft rate?

Yes, with standard brand picks: cement (DG Khan, Maple Leaf, or Bestway), steel (Mughal, Amreli, or Ittefaq Grade-60), first-class machine bricks. Brand substitutions are agreed in writing before procurement. Premium brand upgrades (e.g., Lucky Cement, Fauji) add a small premium.

Is the PKR 2,500/sft rate for any society in Lahore?

Yes. This is our standard 2026 rate across all Lahore societies, DHA, Bahria Town, Park View City, Lake City, LDA societies, OPF Housing, and others. Remote or hard-access sites may incur a small site-mobilisation premium quoted on call.